Write For Us

Thailand: Chinese funded high-speed railway project delayed

Sponsored Post Vitamin D2 Canada Persia
51 Views
Published
Thailand has announced a delay in closing Bangkok’s central station for a month.
The station was due to shut on Thursday to make way for a new high-speed railway - funded in part by Chinese loans.
But those plans have been delayed.
Al Jazeera’s @Tony Cheng reports from Bangkok, Thailand.

@Al Jazeera English

- Subscribe to our channel: http://aje.io/AJSubscribe
- Follow us on Twitter: https://twitter.com/AJEnglish
- Find us on Facebook: https://www.facebook.com/aljazeera
- Check our website: https://www.aljazeera.com/
#Bangkokrailway
#thailand
#aljazeeraenglish
Category
World
Tags
bangkok, railways, transport
Sign in or sign up to post comments.
Be the first to comment